AI systems · Agentic workflows

Five agentic systems I engineered to scale Foster's marketing operation, and how each one decides.

Complex organizations run on handoffs between teams. I design the systems that carry them, so resourcing stays visible, partners stay aligned and people spend their time on judgment and craft.

Each sample shows what starts the workflow, what it reads, where it branches and where a person makes the call. Every system is built to be owned by the team that runs the work. Pick a case on any diagram to trace the path it takes. Names are replaced with roles, and each workflow is labeled with how far it has actually gone.


How I engineer the logic

Trigger · what starts it Reads · what it looks at Decides · where it branches Person · where someone makes the call Writes · what it creates or changes

Running on a schedule now Ran has recorded runs Prototype built and tested Designed specified, not yet built


01 Ran in production · handed to the project manager

A cross-project sweep that finds coordination problems and follows the fix through.

My roleI designed and piloted the agent, then transferred it to our project manager, who now runs it.

Foster's marketing operation runs roughly a dozen channel projects across eight functions, fed by several intake paths. At that scale, the highest-value coordination happens between projects: shared production, aligned dates, and work that can be reused instead of rebuilt.

I designed an agent that reads across the full portfolio, classifies each overlap, and recommends one action. A second sweep carries each approved decision through to verified completion, then the system was handed to our project manager to run.

The complexity

Visibility ends at the project line.

Each project is well run on its own, but shared speakers, shoots and assets sit across several of them.

One request, several dates.

Event, delivery, response and publish dates all drive different resourcing decisions.

Findings need a path to action.

A report is only useful if each item arrives with evidence, a recommendation and a place to decide.

Decisions and follow-through run on different clocks.

Discovery happens weekly; decisions and changes land any day. The system has to hold the thread between them.

How it decides Pick a case to trace its path

Cross-project sweep
Trigger

Monday morning

Sweep across ~12 projects in eight marketing functions

Reads

Changes since the last full scan

New and changed tasks and comments, related open work, relevant completed work

Decides

What kind of overlap is this?

6 paths

Same task listed in two projects

Treat it as one record

One story adapted for each channel

Leave it alone. That's the plan working.

Two teams producing the same thing

Recommend linking, sharing production or consolidating

Dates disagree

Separate event, delivery, response and publish dates, then flag

Something similar was done before

Name what can be carried forward

Nothing material

No flag

Writes

Priority report

Every finding linked with one recommended action. Approved ones become a single subtask with evidence and a definition of done.

Person

Project manager decides

Replies in the thread in plain language

Trigger

Weekday mornings

Follow-up sweep

Reads

Flags and replies

Assignees and the current state of every related task

Decides

Where does this decision stand?

5 paths

Approved and the facts are clear

Apply the change, re-read the task, record it on the flag, close

Someone already did it

Verify and close. No duplicate edit.

No answer yet

One reminder. Private escalation after two business days.

Touches budget, commitments or outside communication

Hand it back to a person

Nothing changed

Quiet run. No message.

The outcome

Results

In its recorded run it caught the photography date mix-up, a headshot session tracked twice and form-building capacity shared across projects. The follow-up sweep found four of five pilot decisions resolved and left the open one alone without re-asking.

Write rules

It writes only after approval, only reversible internal changes (a link, a dependency, a consolidated brief), and re-reads the task afterward to confirm. Budgets, commitments and outside communication go back to a person.

Handover

I packaged the prompts, scope, pilot register and escalation rules so the project manager could own the system. The transfer was sequenced so only one agent ever writes to a record.


02 Running · Tuesday and Friday

Leadership briefs and a source-of-truth check for a multi-program launch.

My roleI designed the reporting and verification workflow for the launch team, and review each brief before it goes to leadership.

A multi-program launch brought together web, admissions, program leadership and engineering, with tuition, dates and credential pathways finalizing in parallel. Leadership needed a weekly view, and a shared overview needed to stay accurate as facts were confirmed.

One sweep writes a Tuesday brief. Another checks Friday's changes against the sources that own each fact and drafts exact edits for the overview, which I approve before anything is changed.

The complexity

Schedules evolve faster than documents.

When a production schedule moves, every reference to it needs to follow.

Leadership needs a view without a meeting.

A weekly brief should come from the work itself, so owners can stay on the work.

Shared documents carry the brand.

Anything partners and prospects read has to match the sources that own each fact.

How it decides Pick a case to trace its path

Launch reporting
Trigger

Tuesday morning

Leadership brief

Reads

Launch tasks

Subtasks, comments, owners, dates, dependencies

Writes

Leadership brief

Last seven days, next two weeks, blockers, decisions needed

Person

I review and forward

Private to me first

Trigger

Friday afternoon

Source-of-truth check

Reads

This week's changes

Checked against program guidance, approvals and admissions

Decides

Is the change confirmed?

3 paths

Confirmed by the source that owns it

Draft the exact replacement copy, where it goes and the evidence

Pending or sources disagree

List it. No edit.

No material change

Nothing to do

Person

I approve the edit

Nothing changes before this

Writes

Controlled edit

Browser compares the live document, changes only what was approved

The outcome

Leadership

A repeatable view of a multi-team launch without a separate reporting meeting.

Accuracy

The overview tracks the sources that own each fact, and the browser step checks the real document before changing it, not a copy from memory.


03 Running · weekdays at 8:30, Fridays at 11

An exception log for guest gifting that only speaks when something changed.

My roleI designed the intake and reporting system. The gifting service itself is owned by Advancement and run by its coordinator.

Every guest speaker visit runs through a short chain: a host request, stock confirmation, pickup or delivery, and handoff. It spans several owners and a service owner in Advancement who manages inventory and the guest experience.

Two scheduled sweeps read the gifting project and report to one shared Reporting task. The design goal was signal over volume: no comment when nothing changed, one comment per material issue, and no edits to requests in progress.

The complexity

Three stages, one record.

A request, a confirmed gift and a completed handoff need to be told apart to report accurately.

Timing is fixed by the visit.

Speaker details and pickup logistics need to be complete well before the guest arrives.

Reporting at the service level.

Inventory and demand decisions need clean weekly counts, not a manual tally.

Attention is a resource.

Updates only stay useful if they appear when something actually needs action.

How it decides Pick a case to trace its path

Gifting exceptions
Trigger

Weekdays, 8:30 a.m.

Daily exception sweep

Reads

Requests and follow-ups

Open and recently closed requests, subtasks, the last reporting comment

Decides

Anything new or changed since the last comment?

3 paths

No

Skip the comment

Yes

Check it against the urgency rules

Can't read the project

Report privately. Post nothing.

Decides

Which exception is it?

6 paths

Missing essentials

Speaker, class or date incomplete

Visit is close, logistics open

Flag as urgent with the owner

Acknowledgment missed

Against the same-business-day standard

Follow-up stale, duplicated or unowned

Name the owner and the next step

Visit late or cancelled

Update the log, not the request

Gift issued, handoff unproven

Ask for the evidence

Writes

One linked comment

Issue, owner, last action, next step

Trigger

Fridays, 11 a.m.

Weekly check-in

Reads

The past seven days

Plus anything outstanding, checked against the running log

Decides

Any activity or unresolved issue this week?

2 paths

None

No weekly comment

Yes

Requests and quantities issued counted separately; patterns, mismatches and decisions for the service owner

Person

Service owner

Feedback can change the format or pause the weekly comment

The outcome

For staff

One place to see what needs action, without extra data entry or edits to requests in progress.

For the service owner

A weekly view of data gaps, stock mismatches, substitutions and fulfillment friction, plus an on-demand report that counts visits, requests and packages separately so nothing gets double-counted.


04 Prototype built · rules designed

Capacity planning for a writer serving three partner groups.

My roleI designed this planning system for our staff writer. She and her editorial manager own the editorial work and every commitment in it.

Our staff writer supports three partner groups: Advancement, marketing leadership and editorial management. Each brings strong story ideas and its own planning cadence, so the real work is allocating one person's capacity across all three.

I designed a planning system in Asana to support her: a Story Bank reconciled from a legacy spreadsheet, rules that route work in without rekeying, triage against real capacity, and decision-ready agendas for each standing meeting. She keeps ownership of every commitment.

The complexity

Two systems of record.

A legacy spreadsheet and Asana both held stories, ideas and completed work.

Ideas and commitments need different tracks.

A promising idea and an assigned story call for different planning, so they need to be stored differently.

Meetings should open with decisions.

Three standing meetings each need a current view of the backlog before they start.

Decisions need to land in the plan.

What gets agreed in a meeting should update dates and assignments without retyping.

How it decides Pick a case to trace its path

Editorial planning
Trigger

Request or idea arrives

From any of three partner groups

Decides

How did it arrive?

3 paths

Formal intake form

Added to the Story Bank for review

Assigned by the editorial manager

Same task appears in her planning view. No rekeying.

Her own idea, mid-quarter

Captured as an idea, not a commitment

Reads

Existing coverage

Work in progress, completed stories, reconciled spreadsheet records

Decides

Triage: duplicate, priority, capacity

4 paths

Already covered

Link the existing story or reuse it

An Advancement ask

Advancement's point person ranks it

Fits priorities and capacity

She confirms. It moves to Active.

Interest, but no room

Backlog. Goes on the next agenda.

Decides

Which meeting is next?

3 paths

Weekly Advancement check-in

The asks that need an answer, ranked, with a recommendation

Weekly with the editorial manager

Deadlines, blocked drafts and capacity collisions she can resolve

Monthly with the CMO

Only the items that need leadership judgment

Person

Writer shares notes

Meeting notes or a transcript

Writes

Proposed plan

Decisions and actions matched to existing tasks

Person

Writer approves

Approval is the write boundary

Writes

Asana updated

Dates, assignments, handoffs. Open questions go to the next agenda.

The outcome

Story Bank

Built a prototype with 27 records imported from the spreadsheet and classified as idea, linked to existing work or archived, with unclear matches flagged for her rather than guessed.

Routing

Two native Asana rules: one for formal intake, one for work already assigned to her. They're kept separate so an idea never enters production by default.

Meetings

Three agenda templates built around the existing meeting cadence, so the system fits how partners already work.


05 Master model built · automation designed

Onboarding as a system: one model, tailored per hire, watched at each milestone.

My roleI audited every archived onboarding project and engineered the model and its automation for the organization. Onboarding itself is owned by Operations.

Onboarding at Foster coordinates a manager, Operations, HR, IT and Facilities around one start date. I ran a scan of every archived onboarding project looking for automation opportunities, tasks that depend on one another, recurring sticking points, and ways the project setup itself (sections, columns, views) could better serve the process. From that I engineered a six-stage master model in Asana for Operations that accounts for all of it, with owners by role, dependencies only where they matter and clear completion criteria.

I then designed how an agent would turn a short hire intake into a role-specific project and support each new hire through their first year, with Operations approving before anything is created.

The complexity

Every role is different.

Staff, development, temporary and student hires need different subsets of the same process.

Requested and ready are different milestones.

An equipment order or access request is a step; a working login is the outcome.

Five partners, one start date.

HR, IT, Facilities, Operations and the manager each own part of a great first day.

Start dates move.

Every dependent date should shift with it automatically.

How it decides Pick a case to trace its path

Onboarding
Trigger

Hire intake

Confirmed start date and role

Reads

Master model

Six stages, owners by role, built from every archived project

Decides

For each template task: does it apply?

3 paths

Applies

Keep it, assign the role owner, date it from the start date

Doesn't apply

Propose excluding it

Unsure

Ask Operations

Person

Operations reviews

Revisions loop back to the draft

Writes

Private project

Checked for owners, dates and access before sharing

Trigger

Each milestone

Before day one through the first year

Decides

Where does this hire stand?

4 paths

Ready

Advance to the next milestone

Needs owner action

Route it to the owner

Blocked

Escalate to Operations

Start date moved

Recalculate remaining dates. Same project, no duplicate.

The outcome

Built

The six-stage master model, from an audit of every archived onboarding project: sections and columns set up to mirror the process, owners by role, connected tasks, and completion criteria that separate a request from a verified outcome.

Designed

The intake, tailoring and milestone sweeps. HR, IT and Facilities keep responsibility for verification, access and equipment; Asana tracks readiness.


The same habits run through my own builds: write the rules down, let the system do the repetitive part, and keep a person at the decisions. See AI systems for the wider program, or the Mower Ledger for the method at home.